Nine steps. Nothing skipped.

The same defined sequence runs on every site, whichever crew arrives at your address.

03 — The quality system

Quality, engineered as a process

Not a promise. A sequence.

  1. 01

    Standards

    Defined specs for every component and every install, agreed before a single panel ships.

    Output — Approved specification sheet
  2. 02

    SOPs

    A documented procedure for every step, regardless of which crew shows up at your address.

    Output — Crew-issued SOP pack
  3. 03

    Components

    Every panel, inverter and cable checked against spec on arrival — before it reaches your roof.

    Output — Inward inspection log
  4. 04

    Installation

    Certified technicians follow the same checklist on every roof. Never random subcontractors.

    Output — Signed installation checklist
  5. 05

    Testing

    Every circuit tested under load before commissioning — insulation, polarity, earthing, output.

    Output — Load & insulation test report
  6. 06

    Commissioning

    Signed off only after the system performs to spec — not on the day the panels go up.

    Output — Commissioning certificate
  7. 07

    Documentation

    Every check and signoff recorded, then handed to you — the same file our engineers work from.

    Output — Customer handover file
  8. 08

    Warranty

    Coverage backed by that documentation, not just a promise made at the point of sale.

    Output — Warranty schedule
  9. 09

    Performance

    Monitored output, so quality keeps showing up long after install day.

    Output — Monitoring dashboard access
Why it matters

Why families and businesses choose BijliSaathi

Local engineers, not agents

Our own salaried engineers and technicians cover Hanumangarh, Sri Ganganagar and Bikaner — the person who surveys your site is on our payroll, not a commission agent.

Callback within one working day

Every enquiry gets a call from an engineer within one working day, and a written proposal within three working days of the site survey.

Service visit in 48 hours

If a system stops generating, we respond on call the same day and reach the site within 48 hours across our three home districts.

Subsidy and net-metering handled

We prepare the discom file, net-meter application and national portal submission for you, and track it until the meter is installed.

Two free health checks a year

For the first two years we return twice a year to clean, torque-check and log generation — included, with no service contract to sign.

One number for the life of the system

Panels, inverter and structure warranties are registered in your name by us, and one WhatsApp number stays your single point of contact for claims.

See the process applied to your site

Book a free assessment and we will walk you through each step for your installation.

Find your solar solution